
Our Kitchen Services
- Layout Redesign
We rework walls, traffic flow, and work zones to fit how you cook and gather.
- Custom Cabinets
Built to size in our shop for a clean fit and smart storage.
- Countertops
Durable options like quartz and solid surface with pro templating and install.
- Backsplash & Tile
Moisture-safe backing, straight lines, sealed grout, clean edges.
- Lighting & Electrical
Task, under-cabinet, and code-compliant circuits with GFCI/ARC-Fault where needed.
- Flooring
Tile, LVP, or engineered hardwood installed with proper prep and transitions.
- Appliance Integration
Sized openings, venting, water, and electrical planned for your models.
Featured Projects
We help make your dream kitchen a reality. In our gallery, you will see examples of layout changes, cabinet lines, tile work, and finished spaces.








Testimonials
Valued Clients
Professional team, on time, and the work looks fantastic.
Amand L.
Clear plan, daily progress, and a spotless site.
Peter P.
They handled design and build, which made everything simple.
Tom K.
Kitchen Remodeling Installation Process
- Site protection and dust control
- Demolition and haul-off
- Rough plumbing and electrical
- Wall fixes and layout framing
- Cabinet install and leveling
- Countertop templating and install
- Tile, paint, and trim
- Appliance set and hookups
- Final clean and walkthrough


Benefits of a Professionally Remodeled Kitchen
- Better workflow and storage
- Strong, long-lasting materials
- Cleaner, brighter workspace
- Low-maintenance finishes
- Higher home value
- Safer power and ventilation
- Design that fits your home’s style
Kitchen Design Process
- Design consultation and site measure
- Layout drawings and elevations
- Selections for cabinets, counters, tile, lighting, flooring
- Itemized estimate and schedule
- Final plan approval

Our Maintenance Guides
- Regular cleaning tips
Wipe counters daily with mild cleaner. Sweep or vacuum floors to protect finish.
- Sealing recommendations
Follow factory guidance for stone or grout. Re-seal on the recommended schedule.
- Cabinet care
Use a soft cloth with gentle soap and water. Do not soak. Dry handles and edges.
- Appliance care
Keep vents clear. Follow maker manuals for filters and seals.
- Long-term maintenance advice
Test GFCIs, check caulk lines, replace worn bumpers and door stops, and keep a record of product warranties.
Why Choose Us?
- Design and build under one roof
- 3,200 plus projects completed with an A+ BBB record
- Licensed trade partners for plumbing, electrical, and HVAC
- Crews show up every day until the job is done
- Clean sites, clear updates, and solid finishes
FAQs
What is the typical timeline for a kitchen remodel?
Most kitchens take 4 to 6 weeks once work begins. Larger structural changes can add time.
Do I need a separate designer?
No. We handle design and construction, which keeps the plan tight and the schedule moving.
Can you move or remove walls?
Yes, when structure and permits allow. We review framing and handle approvals.
Do you build custom cabinets?
Yes. Our shop builds to size with quality materials and hardware.
Will my home be usable during the remodel?
We set up protection and staging. Some phases limit access to the kitchen, but we plan with you to reduce downtime.
Get Started Today
Lee Mash Custom Remodeling delivers kitchen remodeling services in Houston. Tell us what you want from your kitchen and we will design it, build it, and stand behind it.
Our Address
Lee Mash Custom Remodeling
2142 Almond Creek Lane, Fulshear, Texas 77423
Call or Text
Submit Online Form
Start date typically within 3–5 days
Maintenance Tips • Additional Services • Operational Safety Tips
Maintenance Schedule
| Maintenance Task | Frequency | Instructions |
| Regular Cleaning | Weekly | Wipe counters with mild cleaner. Sweep or vacuum floors. |
| Deep Cleaning | Quarterly | Use approved products for counters, cabinets, tile, and floors. Avoid harsh chemicals. |
| Countertop Sealing* | As needed | Follow manufacturer guidance for stone or grout. |
| Caulk and Grout Check | Semiannual | Inspect wet areas and backsplashes. Re-caulk or re-grout where needed. |
| Hardware Tightening | Semiannual | Tighten pulls, hinges, and leveling feet. |
| GFCI/Breaker Test | Semiannual | Test GFCI outlets and check panel labeling. |
| Appliance Maintenance | Per manual | Replace filters, clean coils, and check seals. |
*Only for materials that require sealing.
Kitchen Service Related Applications • Common Kitchen Features
| Kitchen Service Related Applications | Common Kitchen Features |
| Layout Redesign | Work triangles, islands, pantries |
| Cabinet Replacement | Soft-close hardware, pull-outs, dividers |
| Countertop Upgrades | Quartz, solid surface, integrated sinks |
| Tile & Backsplash | Moisture-safe backer, sealed grout |
| Lighting Upgrades | Under-cabinet, task, and dimmers |
| Appliance Integration | Venting, water, electrical hookups |
| Flooring Updates | Tile, LVP, engineered hardwood |
Safety Aspect • Description • Precautions/Recommendations
| Safety Aspect | Description | Precautions / Recommendations |
| Electrical Safety | Kitchens need GFCI and correct circuit loads | Use licensed electricians. Test GFCIs. Label panel circuits. |
| Ventilation | Cooking adds heat, moisture, and odors | Size hood vent correctly. Duct to exterior. Maintain filters. |
| Slip/Trip Hazards | Dust, cords, and uneven surfaces during work | Set dust control, cable management, and threshold ramps. |
| Silica/Dust Exposure | Cutting tile and stone creates dust | Use wet cuts and PPE. Isolate work area. |
| Chemical Safety | Cleaners, sealers, adhesives can irritate | Follow labels. Wear gloves and eyewear. Ventilate. |
| Lifting/Ergonomics | Cabinets and tops are heavy | Team lifts or mechanical aids. Use proper technique. |
| Child/Pet Safety | Active job sites are risky | Block access. Communicate daily schedules. |



